References

Sewage sludge utilisation plant STP Bello, Colombia

In the Colombian city Medellín the new sewage treatment plant Bello is presently under construction. The plant is designed for 2.75 million PE and a capacity of 6.5 m³/s. HUBER SE installed its proven belt dryer type BT to treat the sewage sludge generated on site, erecting one of the largest sewage sludge utilisation plants worldwide.

Capacity:146,000 t/a
Dryer: 3 x HUBER Belt Dryer BT 30
Operation Phase: since July 2018
Netlink:http://www.huber.de/huber-report/ablage-berichte/sludge-treatment/huber-se-builds-one-of-the-biggest-sewage-sludge-utilisation-plants-worldwide.html